Commit Graph

3 Commits

Author SHA1 Message Date
Adriano 1a171acfb2 docs: decision memo Phase 1.5 nemotron run (NO-GO)
Run phase1.5-nemotron-001 completato in 2h26min, costo $0.1244.
Max fitness 0.0215 stagnante (15x peggio del baseline qwen 0.3347),
DSR=0 universale, Sharpe -1.08/-1.15. Loop non converge.

Adversarial Phase 1.5 attivo: 98 finding totali, 35 fees_eat_alpha
HIGH + 15 flat_too_long + 8 time_in_market — i 3 nuovi check killano
correttamente, ma popolazione non ha materiale sano da cui evolvere.

Tre direzioni candidate per Phase 2: A) rollback qwen-2.5-72b,
B) prompt re-tuning nemotron, C) promuovere deepseek-v4-flash.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-11 14:46:35 +02:00
Adriano 943aa38cf2 docs: finalize Phase 1 decision memo + technical report
Phase 1 chiusa con tutti i 5 hard gate passati (run phase1-real-005):

- Loop converge: 3 gen consecutive crescita median 0.0001 -> 0.0188.
- Parse success: 100% (98/98) grazie a JSON grammar.
- Top-5 vs median: 1116x ratio (top-1 fit 0.3347 vs median 0.0003).
- Entropy fitness: 0.914 a gen 9 (sopra soglia 0.5).
- Cost: $0.069 reale vs $700 cap.

Decision: GO Phase 2 con 3 aggiustamenti (Adversarial soglie piu' strette,
speciation di base, walk-forward 70/30).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-10 22:56:42 +02:00
Adriano 6a201c7e49 docs: scaffolding decision memo + technical report Phase 1
Aggiunge i template per gate decision memo (sez. 4.4 spec) e technical
report (sez. 4.5 spec). Da popolare con numeri reali a chiusura del run
phase1-real-001 (in corso).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-10 11:21:26 +02:00