STATO_PROGETTO.md - Bumped snapshot date to 2026-04-27. - Added "Hardening post-restructure (smoke test 2026-04-26)" section recording the four runtime regressions surfaced by the local smoke test (env_file path, missing Station import, UPLOAD_DIR default, apostrophe-in-translation in Alpine), plus the recipe-assignment modal UX rework and the new node-based JS syntax test guard. - Added "Smoke test status" section listing the verified end-to-end flow (MySQL up, alembic, seed, login, admin pages, MeasurementTec workflow, hot reload). - Bumped frontend test count 44 → 46 to reflect test_template_js_syntax.py. ROADMAP.md - Added a tech-debt entry for the user-reported task_complete riepilogo rendering anomaly (still under investigation: the curl fetch returns the table populated, but the user reports an empty body in the browser). - Added a tech-debt entry for the still-pending Docker container smoke test of the new uv-based Dockerfiles. src/frontend/flask_app/templates/measure/task_complete.html - Replaced sort(attribute='task_info.order_index,subtask.marker_number') with two chained stable sorts. Jinja's sort filter does not accept a comma-separated multi-attribute string; the previous form sorted on a non-existent attribute and only worked by accident because the API already returned rows in the desired order. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
5.4 KiB
5.4 KiB
Roadmap TieMeasureFlow — V2.0.0 → V1.1.0 (rev04 / M1 demo cliente)
Aggiornare ad ogni Fase chiusa.
Riferimenti
- Master plan dettagliato:
../superpowers/plans/2026-04-17-rev04-master-roadmap.md - Spec sorgente:
../specs/2026-04-16-schema-sviluppo-rev04.docx - Stato corrente:
STATO_PROGETTO.md
Strategia: due milestone
| Milestone | Scope | Obiettivo |
|---|---|---|
| M1 — Demo cliente | Fasi 1-5 + deploy "demo" | Sistema testabile end-to-end col cliente per raccogliere feedback |
| M2 — Produzione | Fasi 6-7 + correzioni post-feedback + GAIA live | Rollout su tablet/PC reali |
Stato Fasi (M1)
| Fase | Scope | Stato | Branch / Commit |
|---|---|---|---|
| 1 | Stazioni + identità per-tablet | ✅ COMPLETATA | V2.0.0 (merge ea8e468 da feature/rev04-phase1-stations) |
| 2 | Ruolo Capoturno (Supervisor) + override token breve | ⏳ Da iniziare | — |
| 3 | Editor ricetta a blocchi (preparation + measurement) | ⏳ Da iniziare | — |
| 4 | Workflow operatore (retry/timer/autologout/avvio produzione) | ⏳ Da iniziare | — |
| 5 (M1) | ImportOnlyGaiaClient + UI import dati cliente reali |
⏳ Da iniziare | — |
| Deploy M1 | VPS demo (compose + Traefik + LE, no registry) | ⏳ Da iniziare | — |
Stato Fasi (M2)
| Fase | Scope | Stato |
|---|---|---|
| 5 (M2) | GAIA reale (protocollo TBD, polling, comandi produzione) | ⏳ Bloccata da decisioni cliente (D-0.1, D-0.2) |
| 6 | Deploy B industriale (registry privato + Watchtower + STATION_ID per-tablet + CI release) | ⏳ Pianificata |
| 7 | Hardening, security review, E2E sito pilota, docs aggiornati, i18n delta | ⏳ Pianificata |
Decisioni aperte (bloccanti per M2 / future fasi)
Da: master plan §0 "Precondizioni e Decisioni Aperte". Da risolvere col cliente prima della Fase 5/6.
| ID | Decisione | Stato | Bloccante per |
|---|---|---|---|
| D-0.1 | Protocollo integrazione GAIA (REST / DB shared / OPC-UA / file) | Aperta | Fase 5 reale (M2) |
| D-0.2 | Credenziali e rete GAIA (VPN / firewall / whitelist IP) | Aperta | Fase 5 reale (M2) |
| D-0.3 | Target hardware "tablet" (Windows / Linux industriale / Android) | Aperta | Fase 6 (deploy B) |
| D-0.4 | Cicalino/luce avviso (audio HTML5 / hardware USB / entrambi) | Rimandata a M2 | Fase 4 finale |
| D-0.5 | Parametri runtime modificabili vs versione immutabile | Aperta (raccomandato B: separare volatili) | Fase 3 |
| D-0.6 | Auth capoturno durante override (modale / PIN / RFID) | Aperta | Fase 2 |
| D-0.7 | Timeout auto-logout | Risolta | — |
| D-0.8 | Naming ruolo capoturno | Proposta: Supervisor |
Fase 2 |
| D-0.9 | Tag versione immagine docker | Proposta: SemVer + latest |
Fase 6 |
| D-0.10 | Registry esposto su Internet o solo VPN | Proposta: solo VPN cliente | Fase 6 |
Tech debt da chiudere
| Item | Priorità | Note |
|---|---|---|
3 test backend pre-esistenti rotti (test_recipes, test_tasks) |
Media | Investigare prima di Fase 3 (toccano recipe + task router). |
1 test client pre-esistente rotto (test_save_measurement_proxy) |
Bassa | Probabilmente CSRF/payload. Risolvere con Fase 4. |
Pagina task_complete riepilogo: utente segnala riga vuota in alcuni scenari |
Media | Da debuggare (rendering corretto via curl ma utente vede vuoto in browser, possibile interazione con sessione lot/serial). |
.env rename a convenzione spec (SERVICE_NAME, SERVICE_DOMAIN, API_KEY) |
Bassa | Rinviato (impatto deploy). |
Header X-API-Key rename a X-Api-Key |
Bassa | Vedere se M2 lo richiede. |
Envelope risposta {success,data,error} |
Bassa | Eventuale API v2 in M2. |
Dockerfile.frontend: pybabel compile via uv run non testato in build reale |
Alta | Verificare al primo docker compose build. |
| Smoke test in container Docker (non solo locale uvicorn+gunicorn) | Alta | Validare che i Dockerfile riscritti con uv buildino e girino correttamente prima di chiudere V2.0.0. |
Open per scelta utente prima della prossima sessione
- Quale fase iniziare adesso? Opzioni: Fase 2 (Supervisor — sblocca workflow), Fase 3 (block editor — independente), Fase 5 (import GAIA dati reali — sblocca demo).
- Revisione decisioni aperte col cliente — D-0.1 / D-0.2 / D-0.3 / D-0.6 prima di pianificare Fase 5 e 6.
- Smoke test Docker della nuova struttura V2.0.0 (
docker compose -f docker-compose.dev.yml up --build) per validare i Dockerfile riscritti. - Test di carico (k6/locust) a 20 VU su
/measure/save-measurementper validare la scalatura worker (capacità annunciata: 20-30 tablet contemporanei).
Stima tempi residui M1 (post-Fase 1)
| Task | Stima full-time |
|---|---|
| Fase 2 — Supervisor + override | 1 settimana |
| Fase 3 — Block editor | 1.5 settimane |
| Fase 4 — Workflow operatore | 2 settimane |
| Fase 5 (M1) — Import-only GAIA | 1 settimana |
| Deploy M1 demo | 0.5 settimane |
| Totale M1 residuo | ~6 settimane |
Stima tempi M2 (dopo feedback)
| Task | Stima |
|---|---|
| Aggiustamenti post-feedback | variabile (1-2 sett.) |
| Fase 5 reale GAIA | 1-2 settimane |
| Fase 6 deploy B | 1 settimana |
| Fase 7 hardening | 1-2 settimane |
| Totale M2 | ~4-7 settimane |
Totale fino a produzione: ~10-13 settimane full-time da oggi (2026-04-25), assumendo decisioni aperte risolte in tempo utile.